Back to top
Top
U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

["Assessment, Performed": "History of hip fracture in parent"]

Performance/Reporting Period
2022
Value Set Description from VSAC
Clinical Focus: The purpose of this value set is to represent concepts for H145 assessments of a family history of hip fracture in a parent.
Data Element Scope: This value set may use a model element related to Assessment.
Inclusion Criteria: Includes concepts that represent an assessment for family history of hip fracture in a parent.
Exclusion Criteria: No exclusions.

Constrained to codes in the Assessment, Performed: History of hip fracture in parent value set (2.16.840.1.113883.3.464.1003.113.12.1040)

QDM Datatype and Definition

"Assessment, Performed"

Data elements that meet criteria using this datatype should document completion of the assessment indicated by the QDM category and its corresponding value set.

Timing:

  • relevant dateTime references timing for an assessment that occurs at a single point in time.
  • relevant Period references a start and stop time for an assessment that occurs over a time interval
  • author dateTime references the time the action was recorded.
  • Refer to the eCQM expression to determine allowable timings to meet measure criterion.

Note: negation rationale indicates a one-time documentation of a reason an activity is not performed. Negation of QDM datatype-related actions for a reason always use the author dateTime attribute to reference timing and must not use relevantPeriod.

QDM Attributes

relevantDateTime

Relevant dateTime addresses the time an activity occurs as a single point in time. If the activity occurs over a period of time, use Relevant Period.

relevantPeriod

Relevant Period addresses the time between the start of an action to the end of an action. Each datatype using relevant period defines specific definitions for the start and stop time for the action listed.

Note: negation rationale indicates a one-time documentation of a reason an activity is not performed. Negation of QDM datatyperelated actions for a reason always use the author dateTime attribute to reference timing and must not use relevantPeriod

Last Updated: Jul 08, 2021